Walk In Freezer Installation Process

 

Steps

Make sure you have the manual first.

read the manual and use the video as a help guide

before opening the skit, make sure everything matches

locate the parts box and keep it safe

electrical work be done by a license electrical

heating ventilation air conditioning work done by a license heating ventilation air conditioning contractor

panels will have a parts number that corresponds with the drawing

make sure the site is clean and level for the box

create an outline of where the panels will go

make sure the chalk lines are square

Chinese:

  • 确保您首先拥有手册。
  • 阅读手册,并使用视频作为辅助指南。
  • 在打开组件包之前,确保所有部件匹配。
  • 找到零件盒并妥善保管。
  • 电气工作必须由持证电工完成。
  • 供暖、通风和空调(HVAC)工作必须由持证 HVAC 承包商完成。
  • 面板上会有与图纸对应的零件编号。
  • 确保现场清洁并保持水平,以便放置箱体。
  • 勾勒出面板的安装轮廓。
  • 确保粉笔线呈直角。

Spanish:

  • Asegúrese de tener el manual primero.
  • Lea el manual y use el video como guía de ayuda.
  • Antes de abrir el kit, asegúrese de que todo coincida.
  • Ubique la caja de piezas y manténgala segura.
  • El trabajo eléctrico debe ser realizado por un electricista con licencia.
  • El trabajo de calefacción, ventilación y aire acondicionado debe ser realizado por un contratista con licencia en calefacción, ventilación y aire acondicionado.
  • Los paneles tendrán un número de pieza que corresponde con el dibujo.
  • Asegúrese de que el sitio esté limpio y nivelado para la caja.
  • Cree un contorno de dónde irán los paneles.
  • Asegúrese de que las líneas de tiza estén a escuadra.